Ningbo (P&M) Plastic Metal Products Co., Ltd. has 17 years of mold manufacturing technology and can customize Smart Kitchen Storage Components moulding. We provide professional customized Smart Kitchen Storage Components moulding services, and we are a professional Smart Kitchen Storage Components moulding manufacturer. We have sufficient experience in selecting product raw materials and mold materials. In the process of customizing Smart Kitchen Storage Components moulding, our factory can provide one-stop service. We have design and production capabilities related to Smart Kitchen Storage Components moulding, such as: CAD design, mold manufacturing, injection molding, plastic product production, assembly and other technologies.
In addition, our company has established cooperative relationships with plastic raw material suppliers, printing manufacturers, etc. to ensure the supply of raw materials and printing quality. Through our rich experience and perfect supply chain, our company can provide customers with high-quality customized Smart Kitchen Storage Components moulding products to meet their specific needs. At the same time, we have 10 years of professional foreign trade service experience, understand the foreign trade process, and better serve our customers. For Smart Kitchen Storage Components moulding products, we can make corresponding plastic parts, which is mainly done through injection molds.


## Pre-production Preparation Phase (Prioritizing Smart Component Integration)
### 1. Verification of Drawings, DFM, and Tolerances
1. Define Zones: Clearly delineate between **food-contact zones (PP)** and **non-contact electronic zones (PP/ABS)**. Ensure the electronic compartment is strictly isolated from any cavity exposed to liquids (such as soups or broths) by incorporating water-blocking ribs or barriers.
2. Tolerance Classification:
- High-precision dimensions: PCB slots, center-to-center distances for mounting bosses, sensor windows, magnetic positioning features, and strain-relief (SR) cable anchor points (±0.05–±0.10 mm).
- Functional assembly features: Sealing rabbets/shoulders and stacking alignment features (±0.10–±0.15 mm).
- General cosmetic dimensions: Adhere to MT5–MT6 standards.
3. Targeted Mold-Flow Analysis: Evaluate areas prone to sink marks, weld lines, or warpage—specifically at electronic mounting bosses, thin-walled sensor windows, and long slots. **Weld lines must not occur on PCB support surfaces, sealing interfaces, or magnetic mating surfaces.**
4. Component List Alignment: Verify assembly clearances for embedded brass inserts, light-transmitting components, sealing rings, strain-relief (SR) cable anchors, and magnetic elements; ensure adequate tolerance stack-up allowances for assembly. ### 2. Mold Validation (Specific to Smart Storage Solutions)
- Cavity Steel: S136 (HRC 48–52) for food-contact sealing surfaces; NAK80 for ABS electronic component brackets.
- Gating: Bottom-fed valve-gate hot runner system is preferred; gates must be positioned away from PCB slots, boss columns, light-transmitting windows, and sealing ring grooves.
- Venting: 0.015–0.02 mm for PP; 0.01–0.015 mm for ABS. Venting inserts must be incorporated at the ends of long PCB slots and on both sides of sensor windows.
- Insert Molding: Brass nuts should be integrated via lifters/sliders (during molding) or installed post-molding using a thermal-staking (heat-melting) process.
- Cooling Channels: Independent cooling circuits for sealing ring areas and electronic boss clusters to prevent uneven shrinkage caused by localized temperature differentials.
- Ejection: Ejector pins must not contact PCB support surfaces, light-transmitting areas, or sealing surfaces. For deep-cavity containers, use shaping fixtures to maintain the roundness of the container opening.
### 3. Preparation of Raw Materials, Auxiliaries, Tooling, and Inspection Gauges
1. Raw Materials: Food-grade copolymer PP (for contact areas) and food-grade ABS (for decorative brackets). Verify raw material batch numbers against the Certificate of Analysis (COA); ensure masterbatch is food-grade. Establish a fixed ratio for regrind, label it clearly, and strictly prevent the contamination of ABS regrind with PP.
2. Tooling: Shaping fixtures for container openings; go/no-go gauges for PCB slots; position gauges for boss columns; leak-testing fixtures for seals; and stacking-limit fixtures.
3. Measuring Equipment: 2D vision measuring systems, height gauges, and temperature-controlled inspection stations (maintained at 23±2°C).
4. Safety/Compliance Documentation: Migration test reports for PP/ABS materials; safety-compliant design drawings incorporating stress-relief (SR) features. ## II. Trial Molding + Phase Verification (Smart Storage Solutions Require Additional Electronic Assembly Verification)
>
> Trial molding goes beyond checking external dimensions; it involves a full-scale trial assembly of the plastic housing and all electronic components.
1. Initial Mold Sampling & Cooling/Aging: PP parts are left to settle for 24 to 72 hours before re-measurement to account for post-molding shrinkage.
2. Dimensional Inspection:
- Standard: Wall thickness, sealing lips/rabbets, and stacking height.
- Smart-Specific: Boss center-to-center distances, slot width and depth, flatness of light-transmitting windows, cable exit hole positioning, and magnetic alignment dimensions.
3. Individual Component Verification: Parts are subjected to a 100°C water bath for 30 minutes, then cooled and re-measured for tolerances; the water-resistant structure of the electronics compartment is inspected for deformation or leakage.
4. Full-Assembly Trial:
Includes PCB insertion/removal, fastening with brass inserts, press-fitting of light-transmitting components, strain relief (SR) cable assembly, magnetic alignment, and installation of sealing rings.
Checks: Ensure no stripped screw threads, no PCB warping, no cracking of light-transmitting components, and that cable bends meet strain relief (SR) tensile strength requirements.
5. Basic Aging/Stress Testing: Thermal cycling and simulated dishwasher cycles, followed by a re-inspection of assembly clearances.
6. Sample Sealing (Final Approval): Samples representing the approved appearance, dimensions, assembly fit, and failure benchmarks are signed off by both parties. ## III. Mass Production Injection Molding Process (Standard Machine Workflow)
>
> Prioritize the use of machines dedicated to food-grade components. Use separate machines for PP and ABS to prevent cross-contamination.
1. **Machine Warm-up and Calibration**
Heat up the barrel and mold temperature controller (MTC); ensure MTC control precision is within ±1°C. Inspect thermocouples and pressure sensors. Clean the mold, ensuring no carbon deposits remain.
- PP Reference: Mold temperature 50–60°C; barrel temperatures 180–190–200–210°C.
- ABS (Electronic Bracket): Mold temperature 60–80°C; barrel temperatures 200–210–220–230°C. Material must be pre-dried at 80°C for 2–4 hours.
2. **Machine Purging and Material Verification**
Use food-grade purging compound when changing materials. After purging, perform "air shots" to clear any residual material. Load the raw material (including a fixed proportion of regrind) and stabilize the melt.
3. **Automated Injection Molding (Process Parameters Locked; No Unauthorized Adjustments)**
Utilize multi-stage injection and multi-stage holding pressure. Maintain low back pressure to ensure stable shear.
Key Focus: Areas such as PCB slots and "boss" features—where thick ribs are concentrated—require locked holding pressure parameters to prevent sink marks. Simultaneously, set an upper limit for holding pressure to avoid expansion of the container opening, which could compromise the seal.
4. **Mold Opening, Ejection, and Part Removal**
Ensure balanced ejection. Immediately place the removed parts into a **sizing fixture (jig) for the container opening** and allow them to cool to room temperature before removal (mandatory for parts with annular seals).
5. **Initial Inspection and Aging/Stabilization**
Operators perform visual inspections for defects such as black spots, flash, short shots, burn marks, or scratches on transparent surfaces.
Transfer qualified parts to an aging/stabilization area. PP components must undergo a **minimum 24-hour stabilization period** before precise dimensional inspection. Segregate and label non-conforming parts.
6. **In-Process Quality Control (IPQC)**
Sample parts every 2 hours; perform Statistical Process Control (SPC) on critical dimensions. Maintain records; focus on tracking BOSS center-to-center distances, sealing registers (shoulders), and PCB slots.
Retain and compare samples from the first-off, in-process (patrol) inspections, and final-off runs to monitor mold wear (specifically wear on inserts, registers, and snap-fit slots).
We are a Smart Kitchen Storage Components moulding manufacturer, providing high-quality Smart Kitchen Storage Components moulding manufacturing. As long as you want to customize/develop Smart Kitchen Storage Components moulding products, you can find us. We have professional injection mold design and mature manufacturing technology, providing you with one-stop service, from product design-mold making-product production-product packaging-product transportation, we can help you in every link. As long as you come to us, we will provide you with the ultimate service and satisfy you in terms of product quality, production time, information dialogue, etc.
|
Product Name |
Treadmill moulding |
|
Pls provide |
2D, 3D, samples, or the size of the multi-angle pictures |
|
Mould Time |
20-35 Days |
|
Product time |
7-15 Days |
|
Mould precision |
+/-0.01mm |
|
Mould life |
50-100 million shots |
|
Producing Process |
Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples |
|
Mould cavity |
One cavity, multi-cavity or same different products be made together |
|
Mould material |
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
|
Runner system |
Hot runner and cold runner |
|
Base material |
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
|
Finish |
Pitting the word, mirror finish, matte surface, striae |
|
Standard |
HASCO, DME or dependent upon |
|
Main technology |
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc. |
|
Software |
CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances) |
|
Product material |
ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. |
|
Quality system |
ISO9001:2008 |
|
Establish time |
20days |
|
Equipment |
CNC,EDM,Cutting off Machine,plastic machinery,etc plastic suitcase mould zhe jiang |




We are Custom Plastic Mold factory. Our factory is plastic injection mold maker. we has 17 years of experience in professional custom plastic mold and 10 years of foreign trade experience. We are custom Plastic Mold supplier. We can provide custom Plastic Mold service. Our factory can make the Injection molded plastic parts, and the quality of the products will satisfy you.
We have more than 50 high-end machines and hundreds of engineers and designers. We can provide one-stop service, from product design - mold making - product production - product packaging - transportation. We have a complete production chain. We can meet all your requirements.
Professional custom mold service, Plastic mold design and manufacturing .plastic product production, product design, mold design, blow mold customization, rotational mold customization, die-casting mold customization. 3D printing services, CNC manufacturing services, product packaging, customized packaging, shipping services.









We always adhere to the principles of quality first and time first. While providing customers with the highest quality products, try to maximize the production efficiency and shorten production time. We are proud to tell every customer that our company has not lost any customer since its establishment.If there is a problem with the product, we will seek a solution actively and take responsibility to the end.
Q1: Are you trading company or manufacturer ?
A: We are manufacturers.
Q2. When can I get the quotation?
A: We usually quote within 2 days after we get your inquiry.
If you are very urgent, please call us or tell us in your email so that we can quote for you first.
Q3. How long is the lead-time for mold?
A: It all depends on the products' size and complexity. Normally, the lead time is 25 days.
Q4. I have no 3D drawing, how should I start the new project?
A: You can supply us a molding sample, we will help you finish the 3D drawing design.
Q5. Before shipment, how to make sure the products quality?
A: If you don't come to our factory and also don't have the third party for inspection, we will be as your inspection worker.
We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
Q6. What is your payment terms?
A: Mold Payment: 40% deposit by T/T in advance, 30% second mold payment before sending out the first trial samples, 30% mold balance after you agree the final samples.
B:Production Payment: 50% deposit in advance, 50% before sending out the final goods.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products.
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.